Auditing the Implementation of EC Plan and Target
Pursuant to Section 11 (8) and Section 22 of the ECP Act 1992 (B.E. 2535) in combination with the Ministerial Regulation that requires the owner of designated factory / building to audit the implementation of EC plan and target by reporting an audit result in part 4 of the Form Bor Por Ror 1 for submitting an energy production, consumption and conservation for designated factory or in part 3 of the Form Bor Por Or 1 for submitting a building usage, energy consumption and conservation for designated building.
Ministerial Regulation Re: Criteria, Methods and Timeline for Determining the EC Plan and Target and Auditing the Implementation of EC Plan and Target for Designated Factory and Designated Building 2004 (B.E.2547)
Guidance on Establishing the EC Plan and Target for Designated Factory
Guidance on Establishing the EC Plan and Target for Designated Building
Ministerial Regulation Re: Criteria, Methods and Timeline for Recording and Submitting the Energy Conservation Data 2004 (B.E.2547)
Instruction on Filling-in the Form : Bor Por Ror 1 and Bor Por Ror 2 by Designated Factory
Instruction on Filling-in the Form : Bor Por Or 1 and Bor Por Or 2 by Designated Building
Punishment for Violators
1. The owner of designated factory / building does not audit the implementation of EC plan and target and submit to DEDE, shall be fined at not over 100,000 baht (Section 56).
2. The owner of designated factory / building or the PRE who does endorse the facts for auditing the implementation of EC plan and target as faults, shall be imprisoned for not exceeding 1 month or shall be fined at not over 50,000 baht , or both (Section 57)